[Intercultural Design] Final Project
07.01.2019 - 22.02.2019 (Week 1 - Week 7)
Zoe Wong Zen Yee (0336770)
Intercultural Design
Final Project
Instructions
Week 5
There is no lecture this week as it is Chinese New Year.
Week 6 - Week 7
My group we started to plan the final outcome for the module. From the idea in our proposal, we decided to make a tunnel book. At first we want to put interior furniture. After consulting with Ms Anis and Mr Asrizal, we decided to use abstract shapes as to show the spaces that is used up.
Below is the presentation slide for the final compilation:
0 comments